Cooper Mine in Philippines
Oct. 04, 2023
Model of pump 12 inches pump in Philippines copper mining, the mining test the working life by pumping dry ores.
Supplier: weyman
Model of Pump: 350x300ST-HAD A09 material
Working position: Cyclone feeder pumps after mill
Date installation: Nov.21,2008
Date pull out: Sep.21,2009 T
Total working dry ores: 700,398.5 tons Operating time:3294.6 hours
Description: Our pumps'life is longer 10% than Warman, twice life than other chinese supplier.